Engineering  |  Land Surveying  |  Site Development

Hibbing  218.262.5528  |  Duluth  218.720.6219




This new 12,00 SQF office, built on a 70 acre field in Northern Minnesota, is the headquarters for Disability Specialists.


The fast growing business required a building that was site sensitive, easily expandable, provided a quality interior environment and projected an image consummate to the company.


JPJ Engineering provided:



Disability Specialists

Cook, MN

  • site plan including site access from Highway 115 to the building
  • grading, drainage and erosion control plan including SWPPP
  • on-site utility plan
  • planning of a through road from the building to Highway 53
  • concept plan for the entire parcel for proper layout of the future lots

PROJECT EXPERIENCE